Asian Contractor Association
| Home | Procurement | Contact Us
cƂ̏ڍ
____________________________________________________________________________________________________________
Subcontracting Opportunities
Current City Solicitations
For All Open Solicitations, Please Click Here
____________________________________________________________________________________________________________

Due:
11/19/20


Type: Invitation For Bids (IFB) 
Project Solicitation Number
:
IFB 6100 CLMC790 
Description:
Little Walnut Crk-Flood Risk Reduction from Metric-Rutland     
Summary:
Flow diversion project using box culverts to capture flood waters, allowing the creek base flow to exist. The flood waters will be diverted into the proposed culverts reducing the risk of flooding to approximately 75 homes and 3 road crossings. Approximately 6,100 LF of culverts ranging in size from 18-inch diameter to 13-ft by 10-ft and appurtenances will be installed. Water and wastewater improvements will be installed alongside the flood conveyance culverts. Approximately 5,900 LF of 8-inch and 12-inch water lines and appurtenances will be installed. Approximately 8,100 LF of wastewater lines ranging from 8-inch diameter to 30-inch diameter and appurtenances will be installed. Approximately 2,100 LF of existing asbestos waterline will be removed from the area
Estimated Amount: $15,000,000.00
Asian Goal:
1.62%
Project-Related Questions:
Minda Sarmiento
(512) 974-5645 minda.sarmiento@austintexas.gov
SMBR Contact: John Wesley Smith
(512) 974-7758 smbrcompliancedocuments@austintexas.gov
Response Due
: Prior to 11/19/2020, 02:00 PM
Meeting:
10/20/2020, 01:00 PM
Virtual Pre-Bid Meeting via Microsoft Teams
See Section 00020, Item 11, for link and instructions

____________________________________________________________________________________________________________

Due:
11/17/20

 




Type: Request For Proposals (RFP)   
Project Solicitation Number
: IFB 6100 CLMC826 
Description: Waller Creek Center HVAC Rehabilitation 

Summary: HVAC renovations to existing mechanical equipment to incorporate air handler replacements and selected terminal unit upgrades at Austin Water's Waller Creek Center located at 625 E. 10th Street. Includes replacement of 10 chilled water VAV air handling units (one per floor), replacement of one rooftop outside air unit, new electrical connections from existing panels to new HVAC equipment and terminal unit low pressure ductwork adjustments.  
Estimated Amount:
$1,702,300.00
Asian Goal:
1.18%
Project-Related Question:
Alison Vonstein
(512) 974-7217 alison.von-stein@austintexas.gov
SMBR Contact: Amy Amaya
(512) 974-7605
smbrcompliancedocuments@austintexas.gov
Response Due:  
11/19/2020, 02:00 PM
Meeting: 11/04/2020, 03:00 PM
Virtual Pre-Bid Meeting via Microsoft TEAMS
See Section 00020, Item 11, for link and instructions

____________________________________________________________________________________________________________
 

Due: 11/19/20

 


Type:
Invitation For Bids (IFB) 
Project Solicitation Number
: IFB 6100 CLMC827 

Description: South Lamar Boulevard Corridor - Riverside Dr. to Barton Spr 
Summary: Approximately 1,600 linear feet of corridor mobility improvements for S Lamar BLVD from S of Barton Springs Rd to N of Riverside Dr intersections including sidewalks, shared use paths, bicycle tracks, pavement overlay, medians, signals, etc.  
Estimate Amount: $5,600,000.00
Asian Goal: 0.92%
Project-Related Question:
Brandy Teague
(512) 974-3067 brandy.teague@austintexas.gov
SMBR Contact: Kenneth Kalu
(512) 974-7621 smbrcompliancedocuments@austintexas.gov
Response Due:
Prior to 11/19/2020, 02:00 PM
Meeting: 10/27/2020, 02:30 PM
Location Not Available

____________________________________________________________________________________________________________

Due:
12/10/20


Type:
Invitation For Bids (IFB)   
Project Solicitation Number
: IFB 6100 CLMC823 

Description: Street Rehabilitation Phase 2 IDIQ Project No. 2  
Summary: Rehabilitation of existing pavement structure with new riding surface and possible base structure improvements. Curb, sidewalk, ramp, and drainage corrections will also be considered.  
Estimate Amount: $6,000,000.00
Asian Goal:
0.33%
Project-Related Question:
Octavio Garza
(512) 974-7234 octavio.garza@austintexas.gov
SMBR Contact: Cassidy Villegan
(512) 974-9113 smbrcompliancedocuments@austintexas.gov
Response Due
: Prior to 12/10/2020, 02:00 PM
Meeting: 10/29/2020, 10:00 AM
Virtual via TEAMS

____________________________________________________________________________________________________________
Due:
12/10/20
Type: Invitation For Bids (IFB)  
Project Solicitation Number
: IFB 6100 CLMC824 
Description: Street Rehabilitation Phase 2 IDIQ Project No. 3  
Summary: Rehabilitation of existing pavement structure with new riding surface and possible base structure improvements. Curb, sidewalk, ramp, and drainage corrections will also be considered.  
Amount:
$6,000,000.00
Asian Goal: 0.33%
Project-Related Question:
Octavio Garza
(512) 974-7234 octavio.garza@austintexas.gov
SMBR Contact:Cassidy Villegan
(512) 974-9113 smbrcompliancedocuments@austintexas.gov
Response Due:
Prior to 12/10/2020, 02:00 PM
Meeting:
10/29/2020, 10:00 AM
Virtual via TEAMS
____________________________________________________________________________________________________________

Due:
12/10/20


Type:
Invitation For Bids (IFB) 
Project Solicitation Number
: IFB 6100 CLMC832 
 
Description:
ADA Ramp & Bus Stop Improvements 2021 Citywide IDIQ 
Asian Goal: 0.67%
Amount: $1,500,000.00
Project-Related Question:
Diane Rice
(512) 974-7081 diane.rice@austintexas.gov
SMBR Contact: Veronica Hawkins
(512) 974-7639 smbrcompliancedocuments@austintexas.gov
Response Due
:
Prior to 12/10/2020, 02:00 PM
Meeting: 11/17/2020, 02:00 PM
TEAMS , Room/Suite N/A

____________________________________________________________________________________________________________
COA Contract Procurement information Key offices for Procurement information: SMBR, Purchasing, Public Works, and Land and Contract Management
SMBR, (512) 974-7600
Purchasing, (512) 974-2500
____________________________________________________________________________________________________________
ACA Plan Room services Construction plans, project manuals, and consultation
services available by appointment.

City of Austin, AISD, Cap Metro, Travis County, UT System, and Private contractors deliver construction plans to ACA office regularly. Contact Aletta Sung at 926-5400 or 300-7644 to schedule an appointment.
____________________________________________________________________________________________________________
 
 

Copyright 2008 Asian Construction Trades Association All rights reserved. | Events | News | Services | About Us